Vinhomes Global Gate Hạ Long — a 6,200 ha seaside township on the bay
Vinhomes Global Gate Hạ Long is a seaside township that Vinhomes presents as covering more than 6,200 ha on Ha Long Bay, in Ha An and Tuan Chau wards, Quang Ninh City, opposite the depot station of the Hanoi – Quang Ninh high-speed railway. The project was launched on 25 April 2026; by 09/2026, the Quang Ninh Department of Construction had confirmed more than 7,000 low-rise homes as eligible for sale. The developer's official price list is being updated.
- 6,200 ha
- Scale as presented by Vinhomes
- Over 7,000 units
- Low-rise homes eligible for sale (09/2026)
- 25/04/2026
- Project launch
Vinhomes Global Gate Hạ Long Prices
Updated 9 Nov 2026
As of 9 November 2026, the developer has not published a Vinhomes Global Gate Hạ Long price list. The price of each product depends on the sub-zone, plot location (boulevard frontage, near the station, sea-facing), land area and the policy at the time of the transaction.
- 60 m² terraced townhouses (Vinh Binh Minh 1, Thien Duong Nhiet Doi 1): being updated
- Shophouses, semi-detached and detached villas: being updated
- Apartments (4 Diamond-segment towers): not yet on sale — being updated
An HPR consultant will send you the price list, policy and payment schedule once the developer issues its documents; you can also calculate your home purchase cash flow first.
Home loan calculator
Prices vary by sub-zone, plot location, product type and the policy at the time of the transaction — leave your phone number and an HPR consultant will send you the price list once the developer issues its documents.
Vinhomes Global Gate Hạ Long Legal Documents
Updated 9 Nov 2026
The project's legal name is the Ha Long Xanh Mixed-Use Urban Area; the investor is the consortium of Vingroup JSC – Vinhomes JSC; construction started on 19 December 2025. As of 13 March 2026, the project had not registered a mortgage with any bank. The number of each document has not been published — ask to see a copy of the confirmation of eligibility for sale covering the right zone and plot before paying a deposit (5 groups of documents to check).
Confirmation that off-plan housing is eligible for sale
2,343 units in the Ha Long Xanh mixed-use urban area (reported 17/04/2026)
Confirmation that off-plan housing is eligible for sale and lease-purchase
3,236 low-rise units: 2,853 units in phase 1 of zone A1, 383 units in phase 1 of zone A2; cumulative total over 7,000 units (reported 01/09/2026)
Copies provided by the developer for reference. The originals are held by the developer. Attached documents are the original Vietnamese versions.
Vinhomes Global Gate Hạ Long Location — high-speed rail depot station, Ha Long Bay
Updated 9 Nov 2026
Vinhomes Global Gate Hạ Long spans Ha An, Tuan Chau and Dong Mai wards, Quang Ninh City (formerly part of Ha Long and Quang Yen), along the Hanoi – Hai Phong – Quang Ninh expressway corridor and facing Ha Long Bay.
- Hanoi – Quang Ninh high-speed railway depot station: opposite the project; the line is designed for 350 km/h and expected to be completed in 2028
- About 23 minutes: to Hanoi by high-speed rail once the line is in operation (figure announced by the developer)
- Expressway: on the Hanoi – Hai Phong – Quang Ninh corridor
- Sea: 680 ha of natural beaches and about 200 km of shoreline in the project plan
The 23-minute figure depends on the high-speed railway — an infrastructure project that has not been completed. Also consider the road option when comparing.
Vinhomes Global Gate Hạ Long Location Map
Vinhomes Global Gate Hạ Long Project Overview
Updated 9 Nov 2026
Vinhomes Global Gate Hạ Long is a seaside township by Vinhomes and Vingroup in Quang Ninh, developed on a TOD model — an urban area built around a high-speed rail station, combining housing, retail, resorts, education and an office district.
- Project name: Vinhomes Global Gate Hạ Long
- Legal name: Ha Long Xanh Mixed-Use Urban Area
- Location: Ha An, Tuan Chau and Dong Mai wards — Quang Ninh City
- Investor: consortium of Vingroup JSC – Vinhomes JSC
- Scale: over 6,200 ha (as presented by Vinhomes)
- Sub-zones: Vinh Thien Duong, Vinh Le Hoi, Dao Ky Quan, Vinh Nang Luong Xanh, Dao Xanh Thuong Luu, Dao Tinh Hoa The Thao
- Product types: terraced townhouses, shophouses, semi-detached and detached villas, beach villas, high-end apartments
- Total investment: about USD 18 billion (announced by Vinhomes)
- Construction start: 19 December 2025
- Launch: 25 April 2026
- Project implementation period: 2021 – 2036
What investors should consider at Vinhomes Global Gate Hạ Long
Updated 9 Nov 2026
Points worth checking before you commit, so you can compare them with your own financial plan.
Legal status, batch by batch
The Quang Ninh Department of Construction confirms eligibility for sale in batches: the first batch of 2,343 units (04/2026); by 09/2026 the cumulative total was over 7,000 units, including 3,236 units in zones A1 and A2. Ask which confirmation batch the plot you choose belongs to (5 groups of documents to check).
Infrastructure is a major variable
The 23-minute journey to Hanoi depends on the Hanoi – Quang Ninh high-speed railway, expected to be completed in 2028. Vincom Mega Mall Ha Long Station and the 81 ha VinWonders are expected to be completed in 2027 — all of these dates are estimates.
Cash flow when buying a shell house
The 60 m² townhouses in Vinh Binh Minh 1 are sold as shells, with a 5 m frontage and about 190 m² of floor area. Factor in finishing costs and the period before the property can be used or let when planning; calculate your home purchase cash flow.
Housing demand around the project
The plan includes a 208 ha University Village (15 universities planned, about 76,000 students), a CBD office district and a Vinmec hospital — rental and business demand will develop as each component progresses.
If you need to resell or rent out
After receiving your home, you can consign it for resale or rental with HPR: HPR verifies the documents, surveys the property, advises on the asking price, then markets it and shows it to buyers.
Risks to check yourself
This is a very large project with an implementation period until 2036 and large-scale land filling under way — supply comes in many batches, with several sub-zones on sale at once. Compare prices and handover dates between sub-zones and with other projects in Ha Long; handover dates for individual plots have not been published.
Vinhomes Global Gate Hạ Long Sub-zones and Products
Updated 9 Nov 2026
Vinhomes Global Gate Hạ Long comprises 6 sub-zones. The first inventory is in the Vinh Thien Duong sub-zone; an HPR consultant will send you the size and floor plan of each product code based on the current inventory.
Vinh Thien Duong
The first sub-zone on sale, over 900 ha, divided into 10 smaller areas: boulevard-front shophouses, terraced houses, semi-detached and detached villas, beach villas and a high-rise area.
Vinh Binh Minh 1
Terraced townhouses on 60 m² of land, 5 m frontage, about 190 m² of floor area, handed over as shells; next to the high-speed rail depot station, opposite a complex of 3 golf courses; 12 internal parks.
Thien Duong Nhiet Doi 1
Resort townhouses with a beach right in front of the area; 11 internal parks and the Family Town and Chilltown retail streets.
Diamond-segment apartments
4 apartment towers next to the depot station and beside the golf course, introduced at the Hanoi sales office from 12 July 2026 — not yet on sale.
Other sub-zones
Vinh Le Hoi, Dao Ky Quan, Vinh Nang Luong Xanh, Dao Xanh Thuong Luu, Dao Tinh Hoa The Thao — product information is being updated.
Vinhomes Global Gate Hạ Long Amenities
Updated 9 Nov 2026
The developer has announced 7 groups of amenities, to be completed on a roadmap from 2026 to 2028.
Entertainment, events
An 81 ha VinWonders (expected to be completed in 2027), an outdoor stage for more than 60,000 people and a 3,000-seat theatre.
Golf, sea, marina
12 golf courses across 950 ha, an 800 ha mangrove forest park and the Wonder Marina yacht harbour.
Shopping
Vincom Mega Mall Ha Long Station of more than 7.7 ha, connected directly to the high-speed rail station (expected 2027), Vincom Collection and an outlet area.
Healthcare, wellness
A 14 ha Vinmec hospital and an elderly care area.
Sports, green space
A 13.3 ha Sports District, more than 50 km of cycle paths, the Globe Ha Long forest park of more than 660 ha and a 35 ha landscaped lake.
Education, work
Vinschool, an American international school, the 208 ha University Village and a CBD office district with 30–45-storey towers.
Vinhomes Global Gate Hạ Long Progress
Updated 9 Nov 2026
The announced milestones of Vinhomes Global Gate Hạ Long. Actual site photos are being updated — leave your phone number and an HPR consultant will send you the latest progress of the area you are interested in.
- Completed
Construction start — 19/12/2025
Groundbreaking of the Ha Long Xanh Mixed-Use Urban Area.
- Completed
Launch — 25/04/2026
Vinhomes launched Vinhomes Global Gate Hạ Long; the first inventory is in Vinh Thien Duong.
- In progress
Infrastructure works — 2026
Large-scale land filling, perimeter dykes and the main road network; VinCons is recruiting 10,000 workers for the project (11/2026).
- Upcoming
First amenities — expected 2027
Vincom Mega Mall Ha Long Station, the 81 ha VinWonders.
- Upcoming
High-speed railway — expected 2028
The Hanoi – Quang Ninh line, with the depot station opposite the project.
Frequently asked questions about Vinhomes Global Gate Hạ Long
Updated 9 Nov 2026
Vinhomes Global Gate Hạ Long is located in Ha An, Tuan Chau and Dong Mai wards, Quang Ninh City, on Ha Long Bay and opposite the depot station of the Hanoi – Quang Ninh high-speed railway. Vinhomes presents it as covering more than 6,200 ha, with 6 sub-zones; the project was launched on 25 April 2026.
The legal name is the Ha Long Xanh Mixed-Use Urban Area, and the investor is the consortium of Vingroup JSC – Vinhomes JSC. Construction started on 19 December 2025.
The Quang Ninh Department of Construction has confirmed eligibility for sale in batches; by 09/2026, the cumulative total was more than 7,000 low-rise homes. Each batch covers specific zones and plots — ask to see a copy of the document covering the exact plot you choose.
As of 9 November 2026, the developer has not published a price list. Leave your phone number and an HPR consultant will send you the price list and policy once the developer issues its documents.
The developer cites about 23 minutes by the Hanoi – Quang Ninh high-speed railway once the line is in operation; the line is expected to be completed in 2028. For now, travel is via the Hanoi – Hai Phong – Quang Ninh expressway.
Yes. 4 Diamond-segment apartment towers next to the depot station have been introduced since 07/2026 and were not yet on sale at the time of updating. The first phase is mainly townhouses, shophouses and villas.
After receiving your home, you can consign it for resale or rental with HPR. HPR surveys the property and advises on the asking price based on the market at the time of consignment; HPR makes no commitment on time to sell, sale price or rent.
Get Vinhomes Global Gate Hạ Long Launch Information & Price List
Leave your details and an HPR consultant will call you back at the time you choose: to send you the price list and policy once the developer issues its documents, compare the Vinh Binh Minh 1 and Thien Duong Nhiet Doi 1 townhouses, or let you know when the 4 apartment towers go on sale.
or contact us directly
Your information is used only for HPR to contact you with advice and is processed in accordance with our Privacy Policy.