Vinhomes Green City Hau Nghia — 197 ha, handover Q4 2026
Vinhomes Green City is a 197.2 ha Vinhomes township in Hau Nghia Commune, Tay Ninh Province (Duc Hoa District, former Long An), which broke ground on 26 March 2025. By April 2026, internal roads were open, the 8 ha central lake The Green Lake was completed and The Pop Art Park had opened; the first units are expected to be handed over in Q4 2026. The official price list is being updated.
- 197.2 ha
- Township size
- 26/03/2025
- Groundbreaking
- Q4 2026
- First units handed over (expected)
Vinhomes Green City Construction Progress
Updated 9 Nov 2026
- Completed
Project registration
07/2023 — Green City Development JSC was the only investor to register
- Completed
Groundbreaking
26/03/2025
- Completed
Low-rise sales launch
06/2025
- Completed
The Green Lake completed
End of 03/2026
- Completed
Internal roads opened, Pop Art Park opened
04/2026 (Pop Art Park: 11/04/2026)
- In progress
First units handed over
Expected Q4 2026
Vinhomes Green City Prices
Updated 9 Nov 2026
The developer has not publicly announced the current Vinhomes Green City price list (updated 9 November 2026). Each unit's price depends on the house type, area, plot position, size and the policy at the time of the transaction; units bought in earlier rounds may be resold at agreed prices.
- Terraced houses, shophouses: being updated
- Villas: being updated
You can calculate your home-buying cash flow before viewing units.
Home loan calculator
Prices in resale listings are not the developer's price list — leave your phone number and an HPR consultant will send the official price list and policy with their effective date.
Vinhomes Green City Townhouses and Villas
Updated 9 Nov 2026
Vinhomes Green City is mainly low-rise: over 4,570 villas and terraced houses, divided into The Swan Lake, The Sunrise, The Forest and The Liberty areas. The developer has not publicly announced the size, number of storeys or price of each type — being updated.
Terraced houses
Low-rise townhouses in the township's internal areas; show houses are in the Truong Xuan sub-area.
Shophouses
Shophouses are included in the product mix introduced by the developer; locations and numbers are being updated.
Villas
The plan includes a chain of lakeside villas; villa types and sizes are being updated.
High-rise apartments
Included in the project plan; launch date not announced.
Vinhomes Green City Location in Hau Nghia, Duc Hoa
Updated 9 Nov 2026
Vinhomes Green City is at the junction of Hau Nghia – Duc Lap Thuong – Tan My (Duc Hoa District, former Long An), now part of Hau Nghia Commune, Tay Ninh Province; the project fronts Provincial Road 825.
- Existing roads: PR825 (PR10 – CT02), National Highway 22 and National Highway 1A to Ho Chi Minh City.
- PR823D: a road of over 14 km linking Duc Hoa with Ho Chi Minh City, planned to open on 30 April 2026.
- Ring Road 3, Ring Road 4: two inter-regional routes passing through the north-west; Ring Road 4 is still in the preparation stage.
- Metro line 2 Ben Thanh – Tham Luong: groundbreaking on 15 January 2026; the north-western extension is a planned route.
- New Tay Ninh administrative centre: the province plans to build it in Hau Nghia, with an investment of over 8,000 billion VND.
The unfinished infrastructure works above are planned, and their schedules may change.
Vinhomes Green City Location Map
What Investors Should Weigh at Vinhomes Green City
Updated 9 Nov 2026
Points to review before committing money, so you can compare them with your own financial plan.
Legal status step by step
The developer legal entity is Green City Development JSC. The eligibility-for-sale document numbers for each area have not been fully published in authoritative press — ask to see a copy of the Department of Construction notice covering the exact unit you choose (5 groups of documents to check).
Price and cash flow
The current price list has not been published; resale prices of units from earlier rounds are agreed prices. An HPR consultant will send a unit-by-unit sheet, or you can calculate the cash flow yourself.
Progress you can go and see
Groundbreaking on 26 March 2025; by 04/2026 internal roads were open, the 8 ha Green Lake was completed and Pop Art Park had opened. The first units are expected to be handed over in Q4 2026.
Area infrastructure and planning
Fronting PR825, near National Highway 22; PR823D, Ring Road 3, Ring Road 4 and metro line 2 are under way or planned. Tay Ninh plans to place its new administrative centre in Hau Nghia.
Large low-rise supply
Over 4,570 low-rise units handed over in the same period; when reselling or renting out, your unit will compete with many similar units in the project.
If you need to resell or rent out
After handover, you can consign your unit for resale or rent with HPR: HPR verifies documents, surveys the unit, advises on the asking price, then markets it and shows it to buyers.
Risks to check yourself
The handover date is an estimate; the official date is stated in the contract. The school and shopping centre are still under construction. The distance to central Ho Chi Minh City is greater than for areas on the edge of the inner city — try the route you use every day at rush hour before deciding.
Vinhomes Green City Duc Hoa Project Overview
Vinhomes Green City (the Hau Nghia – Duc Hoa New Urban Area project) is developed by Vinhomes in the centre of Duc Hoa – Hau Nghia, the north-western gateway of Ho Chi Minh City. The project broke ground on 26 March 2025, began selling low-rise homes from mid-2025 and is under construction to hand over the first units in Q4 2026.
- Project name
- Vinhomes Green City (Hau Nghia – Duc Hoa New Urban Area)
- Address
- Hau Nghia Commune, Tay Ninh Province (Hau Nghia town, Duc Lap Thuong and Tan My communes, Duc Hoa District, former Long An); fronting Provincial Road 825
- Developer
- Green City Development JSC
- Development company
- Vinhomes (Vingroup)
- Scale
- 197.2 ha; building density about 25%
- Total investment
- over 28,000 billion VND
- Products
- over 4,570 low-rise units (villas, terraced houses); the project dossier also includes apartments, social housing and resettlement land
- Greenery and water
- about 35.8 ha, including the 8 ha central lake The Green Lake and 5 themed parks
- Commercial
- a 9.6 ha commercial complex, a Vincom Mega Mall of about 40,000 m²
- Expected population
- about 40,000 people
- Groundbreaking
- 26 March 2025
- Expected handover
- first units in Q4 2026
Vinhomes Green City Amenities
Updated 9 Nov 2026
About 35.8 ha of greenery and water, divided into a central lake and 5 themed parks. Some amenities were completed before handover — you can visit and see them in person.
The Green Lake, 8 ha
Completed at the end of March 2026, the township's central landscape axis.
The Pop Art Park, 4.3 ha
Opened on 11 April 2026 — the first park in operation.
Wellness Park
An exercise and relaxation park; reported 100% complete (04/2026).
Aqua Adventure water park
Completed (07/2026), for children and families.
Sportia Park, Retreat Park, Paradise Park
The other three themed parks, gradually opening from late June 2026.
School and shopping centre
Vinschool K-12 school (foundation works in April 2026), a Vincom Mega Mall of about 40,000 m², a Japanese street and a Chinatown street.
Amenities completed before handover allow residents to move in early and give you a basis for estimating rental demand once the township is occupied; HPR does not forecast rents.
Vinhomes Green City FAQ
Updated 9 Nov 2026
Vinhomes Green City is in the centre of Duc Hoa – Hau Nghia, formerly Hau Nghia town, Duc Lap Thuong and Tan My communes, Duc Hoa District, Long An Province. Under the new boundaries from 1 July 2025, the area is part of Hau Nghia Commune, Tay Ninh Province. Not to be confused with Vinhomes Green City in Dan Phuong, Hanoi.
The developer legal entity of the Hau Nghia – Duc Hoa New Urban Area project is Green City Development JSC; the project is developed and sold under the Vinhomes brand (Vingroup). Whichever entity the contract is signed with, check the documents in that entity's name. See the Vinhomes profile.
The developer has not publicly announced the current price list (updated 9 November 2026). Prices in resale listings are not the developer's prices; leave your phone number and an HPR consultant will send the official price list and policy with their effective date.
The first units are expected to be handed over in Q4 2026. The official date for each unit is stated in the sale and purchase agreement.
The project broke ground on 26 March 2025. By April 2026, internal roads were open, the 8 ha The Green Lake was completed and the 4.3 ha The Pop Art Park opened on 11 April 2026; Wellness Park and the Aqua Adventure water park have been completed. The Vinschool school and Vincom Mega Mall are under construction.
Over 4,570 low-rise units (villas, terraced houses); the developer also introduces shophouses and high-rise apartments in the plan — the number of each type is being updated.
The developer has not announced the management fee — being updated. An HPR consultant will send the fee notice once the developer's document is available.
Nothing is guaranteed. PR823D, Ring Road 4, the metro line 2 extension and the new administrative centre are under way or planned, and their schedules may change. Infrastructure is only one factor and does not guarantee any price increase.
You can consign your unit for resale or rent with HPR. HPR surveys the unit and advises on an asking price based on the market at the time of consignment; HPR does not commit to a selling time, sale price or rent.
Get Vinhomes Green City Available Units & Visit Schedule
Leave your details and an HPR consultant will call back at the time you choose: sending the current price list and policy, booking a visit to the show houses and completed amenities, or comparing Vinhomes Green City with other projects in north-western Ho Chi Minh City.
or contact us directly
Your information is used only for HPR to contact you with advice and is processed in accordance with our Privacy Policy.