Infrastructure and prices: how to read infrastructure progress without paying for hype

Count only milestones backed by official documents and works actually under construction: Long Thanh airport was approved in principle in 2015 and broke ground in 2021 with a target of completion by the end of 2025, but it is now aiming for commercial operation in December 2026 and full phase 1 capacity after October 2027.

Reading infrastructure progress when buying property — the Long Thanh airport example

Legal basis: National Assembly Resolution 94/2015/QH13 dated 25/6/2015 (investment policy for Long Thanh International Airport); information published by ACV and the Civil Aviation Authority of Vietnam in Government News up to 12/10/2026 · Updated 20/10/2026.

Infrastructure is the reason most often cited in property advertising, and also where prices are most easily inflated. A project goes through many steps, and each one can slip by years. The safe approach is to tie every promise to a document, a date and a specific step.

The six steps of an infrastructure project

Step Verifiable sign Level of certainty
1. Planning Included in an approved master plan Low — there may be no funding or timeline yet
2. Investment policy Resolution / investment policy decision by the competent authority Low – medium
3. Project approval, funding allocated Approval decision, funding source, project owner of the works Medium
4. Site clearance, groundbreaking Groundbreaking ceremony, machinery on site, contract packages signed Medium – fairly high
5. Construction volume reached % of output announced by the project owner of the works Fairly high
6. Opening to traffic / operation Formal announcement of operation High — but capacity may ramp up gradually

Listings often write "coming soon" even for works still at steps 1–2. When you hear "soon", ask: which step is it at, what is the document number, and what is the date.

Example: the Long Thanh airport milestones

Date announced What was announced Source
25/6/2015 The National Assembly decided the investment policy (Resolution 94/2015/QH13), requiring completion and operation by 2025 at the latest National Assembly resolution
05/01/2021 Phase 1 groundbreaking: 1 runway of 4,000 m, capacity of 25 million passengers and 1.2 million tonnes of cargo per year; target completion by the end of 2025 Ministry of Transport (at the time)
31/8/2023 Groundbreaking of the passenger terminal package, contract completion in November 2026 ACV
10/2024 The Government reported to the National Assembly: the project was behind the Resolution 94 milestone Government report
04/10/2025 Civil Aviation Authority: commercial flights expected from June 2026 Civil Aviation Authority of Vietnam
29/6/2026 ACV: output value of the whole project about 77%, aiming for commercial operation in December 2026 ACV
28/7/2026 Transition roadmap with Tan Son Nhat from 1/12/2026, in 3 steps up to March 2028 Civil Aviation Authority of Vietnam
12/10/2026 Flight inspection and calibration 11–19/10/2026; operation at 6–10% of capacity (12/2026–3/2027), about 50% (4–10/2027), 100% after 10/2027 Civil Aviation Authority, ACV

Lessons from this example:

  • The completion milestone slipped from the end of 2025 to June 2026, then to December 2026. Delays are normal for large works — so you should not value a home on the earliest milestone ever mentioned.
  • Commercial operation does not mean busy straight away: in the first months it runs at only about 6–10% of capacity, and international flights move over gradually, season by season of the flight schedule.
  • See the latest news in the article Long Thanh airport flight inspection and calibration.

Signs of price hype

  • Asking prices jump right after infrastructure news at steps 1–2, before any groundbreaking.
  • Adverts say "10 minutes from the airport" without saying by which road, or whether that road has opened.
  • An old completion milestone that has already slipped is used as a reason to close at a price.
  • There are no actual transactions to compare against, only asking prices in listings.
  • Claims that "prices will certainly rise when the works are finished" — infrastructure does not guarantee any price increase.

How to check infrastructure information yourself

  • Official sources: the Government Portal / Government News, the Ministry of Construction, the project owner of the works (for example ACV for the airport), the provincial or city People's Committee.
  • Note the step and the announcement date of each milestone; a milestone with no document behind it counts as not existing yet.
  • Work out real travel times along routes already in use, not planned routes.
  • Long-term value also depends on jobs, schools, healthcare and the resident community — not only on the distance to one project.

This article is for reference only and does not replace legal or financial advice for your specific case.

Checklist for infrastructure claims before you commit money

  1. Write down the name of the works and the promise in the advert (travel time, completion milestone).
  2. Identify which step the works are at: planning, investment policy, approval, groundbreaking, construction volume reached, operation.
  3. Find the original document or news on an official source: document number, date of issue, announcing authority.
  4. Compare the current completion milestone with earlier announced milestones — how many times has it slipped?
  5. Ask about capacity and frequency of operation in the first phase, not just the opening date.
  6. Measure travel time along roads already open to traffic.
  7. Compare asking prices with actual transactions in the same area before and after the infrastructure news.
  8. Value the home on its current state; treat future infrastructure as a factor that may be delayed.

References

Sources in Vietnamese; titles kept in the original, with a short English translation in brackets.

Get a comparison of projects near Long Thanh airport

Once you've sent it, you can pick the day and time slot you'd like an HPR consultant to call.

See also: Checking 6 HPR projects against the latest infrastructure progress · Townhouses and villas near Long Thanh airport · Long Thanh airport flight inspection and calibration

or contact us directly

Your information is used only for HPR to contact you with advice and is processed in accordance with our Privacy Policy.

Get a comparison of projects near Long Thanh airport

Step 1/2

Contact details

What do you need?Buy in a new project

What do you need?

Consign your propertyCall via Zalo07 88 04 04 88
Get directions
Home loan calculator

Monthly payment (principal + interest)—

Own funds
Loan amount
Total interest

Equal monthly instalments, excluding the developer's interest-support period and principal grace period. Indicative only — actual loan amount and rate depend on the bank's assessment.

Bất động sản HPR — Phân phối – Tư vấn – Ký gửi

Request advice from an HPR consultant

Step 1/2

Contact details

What do you need?Buy in a new project

What do you need?

Once you've sent it, you can choose the day and time slot you'd like a HPR consultant to call.Chat on Zalo

HPR · Property consignment

Register a property consignment

Two short steps, no documents needed yet. An HPR specialist will call you back within 2 working days to verify and guide you through the paperwork.

Step 1/2

Contact details

What do you need?Consign to sell

What do you need?

View details ↗Chat on Zalo